
Crane / winch for lifting furniture service in Industrial Area, Ushayrah
In the Industrial Area of Makkah Region, your office or warehouse may sit high with a narrow metal stairwell or none at all.
What we take care of in Industrial Area, Ushayrah
These are the main tasks the service covers in Industrial Area, Ushayrah and the rest of Makkah Region.

- Bringing the piece in through the balcony or window
- Strapping the piece securely throughout the climb
- Steering the piece by rope to keep it off the wall
- Covering corners and faces with protective layers
How the lift runs from start to finish
You describe the site
You tell us the floor, the piece, the width of the balcony or window and the clear ground below, and we decide the method with you.
We wrap and strap
The piece's corners and face are covered with protective layers, and straps keep the doors shut and hold it steady throughout the climb.
We lift and steer
The piece rises slowly while one team member holds a guide rope below so it does not lean into the wall, and another waits at the opening to receive it.
We bring in and place
The piece comes in through the balcony or window, the straps come off and the wrapping is removed, then it is carried to its room and installed if it needs assembly.
Why lifting from outside is safer
Our work for this service









Our customers on Google Maps
متعاونين جدا واسعارهم معقولة
Google Maps review · September 2026ما شاء الله الشباب شغلهم مره ممتاز دقه في العمل و محافظه علي الأغراض أنصح بالتعامل معهم الله يعطيهم العافيه
Google Maps review · August 2026افضل شركه نقل اثاث
Google Maps review · July 2026
Our service in Industrial Area, Ushayrah
When moving large office furniture or equipment, Borooj Al Dammam uses a crane or winch to lift items from outside the building to a window or door at height.
Industrial zones have buildings of varied designs, some with no interior stairs or entrances far too narrow for large sofas or office cabinets. The crane lifts the piece gradually from ground level and angles it towards the upper opening, where the crew receives it from inside and positions it. The work needs exact measurements and coordination between two teams, and may include a pause mid-lift to unwrap the furniture.
The Industrial Area is a district in Makkah Region, on the far side of the Kingdom from Dammam, so moves from here involve a long road trip.
Old and new industrial buildings have different requirements; some allow crane access easily while others need careful assessment of clearances, cables and obstacles.
We serve Industrial Area, Ushayrah in Makkah Region, and we also offer crane / winch for lifting furniture in Al Fayha, Al Khamayel and Taibah.
Nearby areas for Crane / winch for lifting furniture
Common questions about the service in Industrial Area, Ushayrah
Can office equipment be lifted by crane if it is heavy?
Yes, a crane or winch can lift substantial weight. Tell us the piece's weight and shape and where you want it in the building, and we calculate whether the crane suits the location and height.
How long does furniture lifting by crane take at an industrial site?
Time depends on the height, distance from the building edge and available clearance. Straps and wrapping are secured carefully, and lifting may take from minutes to an hour or more depending on conditions. We estimate the time when we assess the site or discuss it with you before arrival.
How do I book crane / winch for lifting furniture in Industrial Area, Ushayrah?
Call us or message us on WhatsApp with your location in Industrial Area, Ushayrah and what you need, and we will arrange the details with you.
How do you handle a very heavy piece such as a piano or a large double fridge?
The weight affects the strapping method and the number of straps used, and the time needed to secure the piece before it rises. A piano, for example, needs careful wrapping around the keyboard corners and the wooden frame, and an extra guide rope. Tell us the piece type and its rough dimensions when you contact us, and we will work out how to handle it with you.
Can furniture be lifted to an upper floor in a building under construction?
Yes, lifting during construction or renovation is common, especially when the lift is not yet ready or the upper floors are cut off. What matters is a wide enough opening for the piece and firm ground at the base. Tell us the site conditions and the available openings.
Does the floor you are lifting to affect how the job is done?
The higher the floor, the longer the lift arm and the more important the guide rope becomes in stopping the swing. On upper floors wind can be a factor, so straps are tightened and the piece is secured at more than one point. We work the details out with you once you tell us the floor and the piece.
Other services in Industrial Area, Ushayrah




