Borooj Al DammamFurniture Moving
عربي +966 57 328 4486
Living room with a sofa, armchair and wardrobe wrapped in film, cartons, and the open door onto a moving truck in the street

Split AC removal & install service in Abqaiq

When a split AC breaks down in your home in Abqaiq or you are moving and want to take it with you, you cannot simply unplug and carry it away.

Call now24 hours, 7 days
What it includes

What we do for split AC removal & install in Abqaiq

Here is what the service includes when we carry it out in Abqaiq; we explain each step when you get in touch.

Split AC removal & install
  • Lifting the indoor unit off its plate carefully
  • A test run to confirm the indoor and outdoor units are working together
  • Unbolting the outdoor unit and lowering it from its position
  • Switching off the unit and sealing the pipes before removal
How we work

The steps of the service in Abqaiq

  1. Seal the pipes, then remove

    Before any joint is opened the pipes are sealed to contain the refrigerant, then the indoor unit is lifted off its plate and the outdoor unit is unbolted and lowered safely from the wall or balcony.

  2. Confirm the new position

    You choose where the indoor and outdoor units will go, and we check that the wall will hold the bracket and that the pipe run is clear.

  3. Fix the bracket and run the pipes

    The indoor bracket is fixed to the wall first, the unit is mounted on it, and then the pipes, cable and drain line are run to the outdoor unit.

  4. Run the test

    The AC is switched on and we watch the cooling, the drain and the cable; if anything in the performance is off, we check the connections before leaving.

Why Borooj Al Dammam

Why correct removal matters

Sealing pipes keeps the refrigerantOpening the pipes without sealing first lets the refrigerant escape and the unit needs recharging.
The drain prevents leaksA drain pipe fitted without the right slope sends water back to the indoor unit and it leaks into the wall.
The test run catches errorsA loose joint or a wiring error shows up in the test run before it becomes a costly fault.
The bracket is the foundationA bracket fixed to a poor wall causes vibration and weakens the mounting over time.
From our jobs

Our work for this service

The company’s white truck with a Borooj Al Dammam furniture moving sticker
A sitting room with sofas, chairs and tables wrapped in film, ready to move
A large hall with a glossy floor and big pieces of furniture wrapped in white
A living room after installation with a corner sofa, a table, a rug and side tables
Round side tables with metal bases set out in a hall
A seating corner with a sofa, an armchair, a glass table and side tables on a rug
Customer reviews

What our customers wrote about us

About the area

Our service in Abqaiq

Removing and installing a split AC is a specialized job that demands care at every step, from disconnection through to the test run.

In Abqaiq, where modern villas stand alongside residential and commercial blocks, removing the unit means accessing both the indoor and outdoor sections. The refrigerant is drained from the pipework first, then the electrical leads and copper tubes are carefully disconnected. If you are moving the AC to another home in Abqaiq or elsewhere in the Eastern Province, the units are prepared for transport with care, then installed at the new location, with the refrigerant recharged and operation tested.

Abqaiq is a town in the Eastern Province and a regional hub, so moves from here to other places in the Eastern Province and neighbouring regions are medium regional trips.

On a regional trip, the units are protected with extra padding to keep them stable inside the truck during the medium-distance journey.

Nearby areas we also serve from Abqaiq: As Sinaiyah, Al Fardus and An Nuzhah.

Split AC removal & install: full service details

Nearby areas

Nearby areas for Split AC removal & install

FAQ

Common questions about the service in Abqaiq

Do you remove the split AC from the home before moving it?

Yes. We come to your home in Abqaiq and remove the units with care, drain the refrigerant, disconnect the pipes and cables, then load them safely in the truck. Tell us where the indoor and outdoor units are and where you want the AC moved to.

What happens after the AC is installed in the new home?

We install the units, reconnect the pipes and cables, recharge the refrigerant and run a test to ensure the AC works properly before we finish.

Do you offer split AC removal & install in Abqaiq and around it?

Yes. We offer split AC removal & install in Abqaiq and in nearby areas such as As Sinaiyah and Al Fardus, as part of our cover of every region of the Kingdom.

Where does the outdoor unit go in the new place?

The outdoor unit is usually fixed to an outside wall, a balcony edge or a roof; the position must be ventilated and able to bear the unit's weight. Tell us your options at the new place and we will advise on the best position.

Can you install the unit in a room that has never had a split AC before?

Yes, we fix the bracket, cut the pipe and cable run, and lay the drain line even if the room has never had a split unit before. Tell us the room position, wall thickness and where you plan to put the outdoor unit.

Do the old pipes need replacing when we reinstall?

The pipes are reused if they are in good condition and long enough for the new distance between the units. If they are short or damaged, this is spotted during removal. Call us or message on WhatsApp with the distance between the positions and we will discuss it with you.

Other services

Other services in Abqaiq

All services
A tidy living room after the move with a sofa, cushions, a table, a rug and a large window onto a residential street

Talk to us about split AC removal & install in Abqaiq

Call us or message us on WhatsApp with your location in Abqaiq and what you need, and we will arrange the details with you.

24 hours, 7 daysCall now
Call now